ASME AG-1:2012 pdf download

ASME AG-1:2012 pdf download.Code on Nuclear Air and Gas Treatment.

(2) each member of the chain depicted in Fig. AA-8130 shall be responsible for notifying the party that qualified their program of planned modifications that might affect the quality of the delivered product
(3) the Fabricator, Material Supplier, and Material Manufacturer shall be responsible for establishing and maintaining an identification and verification program for the traceability of material while under his control
(4) the Fabricator, Material Supplier, and Material Manufacturer shall he responsible for controlling quality during manufacture and fabrication, including control of manufacturing processes. testing, examination, repair, and treatment of the material, including subcontracted services
AA-S200 IDENTIFICATION AND CONTROL OF ITEMS
AA-8210 DOCUMENTATION
Documents for procurement of material and subcontracted services shall include requirements necessary to ensure their compliance with ASME NQA-l and the additional requirements of this paragraph. Measures shall be established to ensure that all purchased and fabricated material and services conform to the requirements of this paragraph.
Measures shall be established for identification and control of material, including partially processed material, throughout the manufacturing and fabrication process and during shipmenL These measures shall ensure that identification is maintained either Ofl the material or on records traceable to the material through manufacture and fabrication. Welding filler metal for use in repair of the material shall also be controlled in accordance with this paragraph.